Home

This is the home page of the WNAC subcommittee formed to study the concept of “capping” I-280 at Winchester. The “cap” is part of a bigger plan, which would be to create corridors along existing expressways and freeways for high-speed transit solutions that would stitch a network of mixed-use communities, built on freeway “caps”, as outlined here:

http://winchesternac.com/2017/05/15/high-speed-vehicle-transit-on-existing-corridors/

and the summary PDF of the “Freeway within a Freeway” concept (one page, printable PDF)

http://winchesternac.com/wp-content/uploads/2016/11/Freeway-within-a-Freeway-Flyer-left-column-10-26-16.pdf

and the “cap” summary (one page, printable PDF)

http://winchesternac.com/wp-content/uploads/2016/11/Capping-280-Flyer.pdf

Committee Charter:

The charter of the committee is to provide a conceptual view of what capping I-280 might look like, possible uses and a road-map for accomplishing a cap.

The deliverable, slated for July 1st, 2017, will be a high-level feasibility study with recommendations on next steps.

The sections to be addressed are described in the above menu options. To join the committee, please contact us using the following form:

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s